Change Risk

  1. Select the Risks and Issues sub-tab under the RAIDD tab.
  2. Ensure ether Split screen or Risks only is selected (radio buttons on top left of screen).
  3. Double-click on the Risk to open it.

  4. Enter the Risk Description.
  5. Optionally enter a description of the Residual Impact of the Risk on the Plan.
  6. Optionally select from the dropdowns a Type and Category.
  7. Enter Risk Raised by. If person is not in the drop down box, click add person to add a new person to the plan.
  8. Select from the dropdown a Residual Severity assessment.
  9. Select from the dropdown a Residual Likelihood assessment.
  10. Select from the dropdown a Date Raised.
  11. Select from the dropdown a Risk Status.
  12. Select ‘show advanced Options.
  13. Optionally enter a description of the Risk’s Avoidance/Mitigation Action.
  14. Optionally enter an Escalation description.
  15. Optionally select from the dropdown the Risk Owner name. . If person is not in the drop down box, click add person to add a new person to the plan.
  16. Optionally enter a By When date for the Action.
  17. Optionally enter a Date Closed for the Action.
  18. Optionally override the Calculated Action Delivery Status.
  19. Click Save.

NB: Residual means ‘after the mitigation actions performed so far’, not ‘even if all the mitigation actions are performed’; so initially Inherent = Residual. But as mitigation actions progress the Residual Severity/Impact reduces. NB: Inherent Severity/Likelihood can only be amended if the Plan’s Workflow Status is Proposed or Approved.